3. Soon after rig positioning, drive the casing into the ground. Generate metal casing to the bare minimum a depth of one m underneath the ground level to choose lateral loads and actions at site. The steel casing also overcome problems on account of groundwater throughout piling. Log in to https://stephengljeq.wssblogs.com/32570645/fascination-about-cast-in-situ-piles-in-dhaka